Span and Spar
Live
Safety

Orlando International Airport opens first dedicated vertipad

Orlando International Airport has opened the first dedicated vertipad at a major U.S. commercial airport, a key step in testing and integrating electric air taxis for future passenger service.

Safety: Orlando International Airport has opened the first dedicated vertipad at a major U.S

Orlando International Airport (MCO) has opened a dedicated vertipad for evaluating electric air taxis. This is the first infrastructure of its kind installed inside a major U.S. commercial airport.

The Atlantis Vertipad, located in the airport's Atlantis parking area next to Terminal C and the Brightline train station, serves as a testing ground. Its purpose is to validate eVTOL integration, routes, and air traffic control procedures. The project is a collaboration between the Greater Orlando Aviation Authority (GOAA), the Florida Department of Transportation (FDOT), the FAA, and NASA.

FAA eVTOL pilot program integration

The vertipad is a core component of a federal eVTOL pilot program. This program aims to help the FAA establish the technical requirements needed for future commercial operations. The FDOT project was selected for this program in March among eight proposals.

Simulations have already confirmed that eVTOL operations can integrate into the airport's Class B airspace without disrupting regular commercial traffic. The recent demonstration marked a transition from those simulations to real-world takeoff and landing operations at the airport.

Joby Aviation demonstration flight

Initial flight demonstrations at the new vertipad were conducted by Joby Aviation. The company performed a crewed flight using its electric, silent, vertical takeoff aircraft prototype on Wednesday, November 4th. This was the second test flight in a 'Future of Flight' series.

The flight used specific routes and procedures developed in collaboration with the FAA and NASA. A similar Joby Aviation flight previously connected St. Petersburg and Tampa. The crewed tour began on October 30 and is scheduled to end at the Kennedy Space Center.

2030 commercial expansion timeline

This vertipad is a precursor to a full commercial vertiport planned for MCO by 2030. The Greater Orlando Aviation Authority aims to have an advanced air mobility vertiport operational at the airport by that date. The goal had previously targeted 2028.

The initiative supports the development of short-haul air transport services, potentially reducing travel time from the airport to Orlando theme parks from up to an hour by road to just minutes. The broader project aims to create an Air Highway Network connecting airports, cities, and specialized facilities.

Florida Secretary of Transportation Jared W. Perdue said strategic investments and partnerships are creating infrastructure for advanced air mobility. Tests at the vertipad will collect critical data on noise levels, safety, and air traffic integration. Joby Aviation stated it is in the fifth and final stage of FAA type certification for its aircraft.

State legislation is paving the way for this future. Florida passed law HB 1093 in April to enable FDOT to fund vertiport construction, with the law effective July 1, 2026. Representative Leonard Spencer expects the first vertiports to begin operations between 2027 and 2028. Governor Ron DeSantis celebrated the test as the start of a 'new era of transportation' in Florida.

The vertipad will transition from demonstration flights to regular commercial air taxi operations by 2030.

Topics

#Safety

Related coverage

More from Safety